PM 17-05-02-c: TANF Payee

WAG 17-05-02-c.

Revised TextWhen the payee for the SNAP unit is also the payee for the TANF unit, set the end date of the SNAP approval period so the TANF REDE and the SNAP REDE come due at the same time.

Revised Text When approving a case at Intake, set the end date of the initial SNAP approval period so the SNAP REDE is due at the same time as the TANF redetermination.

Do not set a SNAP approval period that is more than 12 fiscal months.