| 1 |
ISD |
1 |
Install sprinkler systems in 3 dorms & Elementary bldg. |
$2,488 |
H - Certification and Code |
| 2 |
Choate |
1 |
Life Safety Issues Identified Facility Wide |
$500 |
H - Certification and Code |
| 3 |
Chi-read |
1 |
Upgrade the fire alarm system & other life safety improvements |
$1,900 |
H - Certification and Code |
| 4 |
Alton |
1 |
Life Safety Improvements to Patient Buildings |
$795 |
H - Certification and Code |
| 5 |
ISVI |
1 |
Renovate Boilers & Power House equipment |
$3,000 |
H - Certification and Code |
| 6 |
Kiley |
2 |
C Building Ceiling Repair |
$198 |
H - Certification and Code |
| 7 |
Mabley |
1 |
Door Replacement in Residential Homes |
$480 |
H - Certification and Code |
| 8 |
Shapiro |
2 |
Replace HVAC Return Systems in Residential Buildings |
$1,500 |
H - Certification and Code |
| 1-8 Subtotal |
|
|
|
$10,861 |
|
| 9 |
Chester |
1 |
Complete the replacement of smoke and heat detectors |
$400 |
D - Completion of Ongoing Work |
| 10 |
Elgin |
1 |
Replace Power Plant |
$8,250 |
D - Completion of Ongoing Work |
| 11 |
Madden |
1 |
Renovate kitchen |
$1,238 |
D - Completion of Ongoing Work |
| 9-11 Subtotal |
|
|
|
$9,888 |
|
| 12 |
ISVI |
1 |
Back up Gen set |
$500 |
C - Roads/Utilities/Site |
| 13 |
Mcfarland |
2 |
Replace the domestic water lines |
$7,338 |
C - Roads/Utilities/Site |
| 12-13 Subtotal |
|
|
|
$7,838 |
|
| 14 |
ISD |
2 |
Replace roof on Main Building |
$200 |
B - Shells/Building Systems |
| 15 |
Elgin |
10 |
Replace roof on the Read bldg. (ATC) |
$600 |
B - Shells/Building Systems |
| 16 |
Ludeman |
1 |
Replace windows - renovated homes w/o new windows |
$750 |
B - Shells/Building Systems |
| 17 |
Singer |
2 |
Install Security Systems |
$500 |
B - Shells/Building Systems |
| 18 |
Murray |
5 |
Replace all HVAC Systems in all of the building's |
$1,000 |
B - Shells/Building Systems |
| 19 |
Ludeman |
3 |
Renovate 7 residences (completes home renovations) |
$2,000 |
B - Shells/Building Systems |
| 20 |
Kiley |
1 |
Emergency Announcing System |
$200 |
B - Shells/Building Systems |
| 21 |
Jax |
3 |
Replace roofs on Engineering, Dietary/Stores, Hill, Jones |
$735 |
B - Shells/Building Systems |
| 22 |
Jax |
1 |
Boiler Feed water Lines & Ash Handler System |
$2,085 |
B - Shells/Building Systems |
| 23 |
Howe |
6 |
Update Water Plant |
$1,000 |
B - Shells/Building Systems |
| 24 |
Choate |
7 |
Replace Chillers/HVAC Systems - Residential Buildings & Willow |
$600 |
B - Shells/Building Systems |
| 25 |
Chi-read |
3 |
Replace Non Compliant Door Hardware and Locks |
$750 |
B - Shells/Building Systems |
| 26 |
Chester |
3 |
Elevator Replacement |
$250 |
B - Shells/Building Systems |
| 14-26 Subtotal |
|
|
|
$10,670 |
|
| 27 |
Murray |
1 |
Plan & Begin Rehab Central Dietary/ Residential Kitchens |
$500 |
A - Structural Integrity |
| 28 |
TDF |
1 |
Expansion Project |
$15,000 |
G - Programmatic |
| 27-28 Subtotal |
|
|
|
$15,500 |
|
| 1-28 Total |
|
|
|
$54,757 |
|
| 29 |
Alton |
|
PH-1 / Construct Building Addition (723) |
$15,800 |
B - Shells/Building Systems |
| 30 |
Chaote |
|
Renovate Sycamore |
$2,785 |
B - Shells/Building Systems |
| 31 |
Elgin |
|
Renovation of the Central Dietary (723) |
$3,933 |
B - Shells/Building Systems |
| 32 |
Madden |
|
Renovate for Life Safety Compliance |
$651 |
B - Shells/Building Systems |
| 33 |
ISVI |
|
Renovate Building No. 17 |
$1,289 |
B - Shells/Building Systems |
| 34 |
ISVI |
|
Renovation Classroom/Administration |
$2,369 |
B - Shells/Building Systems |
| 35 |
Howe |
|
Replace Absorption Type A/C |
$450 |
B - Shells/Building Systems |
| 36 |
Howe |
|
Upgrade Plumbing for Kitchen |
$735 |
B - Shells/Building Systems |
| 37 |
Shapiro |
|
Rehabilitate Sewer System |
$2,150 |
B - Shells/Building Systems |
| 38 |
Shapiro |
|
Plan Renovation of Dietary |
$500 |
B - Shells/Building Systems |
| 39 |
Ludeman |
|
Replace Plumbing - Ludeman |
$695 |
B - Shells/Building Systems |
| 40 |
Ludeman |
|
Asbestos Abatement |
$100 |
B - Shells/Building Systems |
| 41 |
Madden |
|
Renovate Residential Pavilions |
$5,252 |
B - Shells/Building Systems |
| 42 |
Murray |
|
Replace EMS |
$585 |
B - Shells/Building Systems |
| 43 |
Murray |
|
Boiler House Renovation |
$3,400 |
B - Shells/Building Systems |
| 44 |
Singer |
|
Renovate HVAC and Residential Areas |
$3,056 |
B - Shells/Building Systems |
| 45 |
Singer |
|
Asbestos Abatement/Res. Renovation |
$202 |
B - Shells/Building Systems |
| 46 |
Chester |
2 |
Install Video Surveillance Cameras in Facility |
$500 |
G - Programmatic |
| 47 |
Kiley |
6 |
A, B, and C Building Windows |
$3,250 |
A - Structural Integrity |
| 48 |
Ludeman |
6 |
Doors, Windows, Tile and Lighting in Support Buildings |
$1,500 |
A - Structural Integrity |
| 49 |
Chi-read |
2 |
Renovate the Dietary |
$4,000 |
B - Shells/Building Systems |
| 50 |
Choate |
9 |
Tunnel System Including Asbestos Abatement |
$4,000 |
B - Shells/Building Systems |
| 51 |
Fox |
2 |
Life safety code (dampers, sprinklers, etc.) |
$160 |
B - Shells/Building Systems |
| 52 |
ISD |
4 |
Renovate bathrooms in 3 dormitories |
$2,655 |
B - Shells/Building Systems |
| 53 |
Jax |
2 |
Upgrade Electrical Systems in Gillespie, Dix, Hill and Jones |
$255 |
B - Shells/Building Systems |
| 54 |
Murray |
10 |
Replace HVAC & Electrical Components in the Pump House |
$220 |
B - Shells/Building Systems |
| 55 |
Singer |
3 |
Replace Boilers |
$250 |
B - Shells/Building Systems |
| 56 |
Singer |
4 |
Renovate Elevators |
$100 |
B - Shells/Building Systems |
| 57 |
Singer |
5 |
Renovate Domestic Hot Water Systems |
$150 |
B - Shells/Building Systems |
| 58 |
Alton |
5 |
Renovate roads, parking lots, sidewalks |
$877 |
C - Roads/Utilities/Site |
| 59 |
Chester |
8 |
Entrance, Parking Lot and Security Station Renovation |
$400 |
C - Roads/Utilities/Site |
| 60 |
Chi-read |
6 |
Main Entrance Road, Exterior Signage and Lighting |
$650 |
C - Roads/Utilities/Site |
| 61 |
Choate |
10 |
Upgrade Roads & Curbs |
$500 |
C - Roads/Utilities/Site |
| 62 |
Choate |
11 |
Replace/Repair Existing Ash Silo at Power Plant |
$500 |
C - Roads/Utilities/Site |
| 63 |
Elgin |
3 |
Rehab roads, parking lots, walks and street lighting |
$3,800 |
C - Roads/Utilities/Site |
| 64 |
Howe |
5 |
Patch and Repair all campus roads and curbs |
$1,500 |
C - Roads/Utilities/Site |
| 65 |
Ludeman |
2 |
Rehab roads, parking lots, sidewalks, street & walkway lighting |
$2,700 |
C - Roads/Utilities/Site |
| 66 |
Mabley |
1 |
Renovate Road, Parking Lots, Exterior Lighting |
$500 |
C - Roads/Utilities/Site |
| 67 |
Madden |
8 |
Rehab roadways, parking lots & sidewalks |
$1,900 |
C - Roads/Utilities/Site |
| 68 |
Mcfarland |
1 |
Upgrade the electrical system campus-wide |
$1,973 |
C - Roads/Utilities/Site |
| 69 |
Murray |
9 |
Rehab Roads, Drives, Parking Lots, Sidewalks, and Storm Drains |
$2,750 |
C - Roads/Utilities/Site |
| 70 |
Tinley P. |
5 |
Upgrade roads and parking lots |
$2,000 |
C - Roads/Utilities/Site |
| 71 |
Choate |
12 |
Dietary/Kitchen Cooler Upgrades |
$300 |
E - Minor Repair & Remodeling |
| 72 |
Chester |
5 |
Replace shingle roofs on 22 buildings |
$300 |
R - Roofing Program |
| 73 |
Choate |
5 |
Replace Roof on Magnolia Building |
$225 |
R - Roofing Program |
| 74 |
Choate |
6 |
Roof on Butler, Administration , Lawn Shed, Industrial Shop |
$200 |
R - Roofing Program |
| 75 |
Mcfarland |
3 |
Replace Roofs on Kennedy & Administration Buildings |
$1,500 |
R - Roofing Program |
| 76 |
Mcfarland |
4 |
Replace Roofs on 7 buildings |
$5,500 |
R - Roofing Program |
| 77 |
Alton |
2 |
Employee Duress System and Install Security Improvement |
$1,000 |
B - Shells/Building Systems |
| 78 |
Chi-read |
8 |
Electrical Energy Conservation Project |
$900 |
B - Shells/Building Systems |
| 79 |
Fox |
4 |
Replace domestic hot water tanks (3) |
$175 |
B - Shells/Building Systems |
| 80 |
Choate |
3 |
Painting, Glazing and WIndow Replacement on Buildings |
$300 |
B - Shells/Building Systems |
| 81 |
Fox |
5 |
Replace closed loop piping, fan coils&controls for Bldgs 1 & 2 |
$950 |
B - Shells/Building Systems |
| 82 |
Fox |
1 |
Renovate Power Plant BZ003 (1) |
$2,055 |
B - Shells/Building Systems |
| 83 |
Howe |
4 |
Replace all windows at Mimosa and Mechanical Buildings. |
$112 |
B - Shells/Building Systems |
| 84 |
ISVI |
4 |
Renovate Dietary |
$1,300 |
B - Shells/Building Systems |
| 85 |
Kiley |
10 |
Home Renovation / Windows |
$1,400 |
B - Shells/Building Systems |
| 86 |
Murray |
6 |
Energy Management System Phase II |
$750 |
B - Shells/Building Systems |
| 87 |
Tinley P. |
1 |
Electrical Upgrade |
$0 |
B - Shells/Building Systems |
| 88 |
Chester |
7 |
Ground Electrical System |
$900 |
C - Roads/Utilities/Site |
| 89 |
Tinley P. |
2 |
Replacement of underground steam lines |
$500 |
C - Roads/Utilities/Site |
| 90 |
Kiley |
7 |
A, B and C Buildings Re-Lamp |
$125 |
H - Certification and Code |
| 91 |
Shapiro |
1 |
Upgrade Steam and Condensate Lines - Phase II |
$6,000 |
H - Certification and Code |
| 92 |
Shapiro |
3 |
Upgrade Sewer System - Phase II |
$1,700 |
H - Certification and Code |
| 93 |
Alton |
9 |
Tuck-point Masonry Structures |
$1,943 |
A - Structural Integrity |
| 94 |
Chester |
10 |
Tuckpointing |
$300 |
A - Structural Integrity |
| 95 |
Choate |
4 |
Tuck-point/Masonry Repairs to Multiple Buildings |
$2,000 |
A - Structural Integrity |
| 96 |
Ludeman |
7 |
Exterior Masonry Repair |
$600 |
A - Structural Integrity |
| 97 |
Madden |
2 |
Survey & repair stuctural settling problems-Pavilions |
$1,275 |
A - Structural Integrity |
| 98 |
Murray |
7 |
Replace Street and Walk Lighting |
$330 |
B - Shells/Building Systems |
| 99 |
Madden |
4 |
Renovate Pavilion |
$2,514 |
B - Shells/Building Systems |
| 100 |
Madden |
5 |
HVAC Upgrade |
$3,070 |
B - Shells/Building Systems |
| 101 |
Ludeman |
5 |
Lighting replacement |
$700 |
B - Shells/Building Systems |
| 102 |
Jax |
4 |
Replace Windows in Bushnell Building |
$330 |
B - Shells/Building Systems |
| 103 |
ISVI |
3 |
Renovate-Gym/Pool |
$1,100 |
B - Shells/Building Systems |
| 104 |
Fox |
3 |
Replace/rehab ext. doors & windows/Bldgs. 2&8 |
$420 |
B - Shells/Building Systems |
| 105 |
Chi-read |
5 |
Concrete Surface and Sidewalk Renovation and Installation |
$650 |
B - Shells/Building Systems |
| 106 |
Kiley |
4 |
Upgrade Roads & Walkways |
$566 |
C - Roads/Utilities/Site |
| 107 |
Murray |
3 |
Daisy Cottage Renovation |
$4,000 |
G - Programmatic |
| 108 |
Murray |
4 |
Cherry Cottage Renovation |
$5,720 |
G - Programmatic |
| 109 |
Singer |
1 |
Renovate Linden & Sycamore - residential areas |
$3,800 |
G - Programmatic |
| 110 |
Mcfarland |
5 |
Remodel Lincoln Hall |
$4,796 |
G - Programmatic |
| 111 |
Chi-read |
4 |
Cooling Tower Replacement and Chilled Water System Renovation |
$500 |
C - Roads/Utilities/Site |
| 112 |
Kiley |
11 |
Pool Upgrade |
$500 |
E - Minor Repair & Remodeling |
| 113 |
Alton |
3 |
Renovate patient shower/bathroom areas-FTC & Locust |
$1,220 |
E - Minor Repair & Remodeling |
| 114 |
Tinley P. |
3 |
Exterior Lighting upgrade |
$0 |
B - Shells/Building Systems |
| 115 |
Howe |
2 |
Remodeling of the five neighborhood houses. |
$2,500 |
B - Shells/Building Systems |
| 116 |
Chi-read |
7 |
Repair or Replace Heating System Component |
$1,950 |
B - Shells/Building Systems |
| 117 |
Kiley |
3 |
A and B Building Floor Tile |
$279 |
C - Roads/Utilities/Site |
| 118 |
Elgin |
5 |
Sanitary and Storm sewer replacement |
$1,700 |
C - Roads/Utilities/Site |
| 119 |
Elgin |
4 |
Replace water mains & associated valves |
$1,900 |
C - Roads/Utilities/Site |
| 120 |
Chester |
4 |
Replace Burners in Boilers |
$0 |
C - Roads/Utilities/Site |
| 121 |
Kiley |
8 |
Replace Residence Duct Work |
$435 |
E - Minor Repair & Remodeling |
| 122 |
Tinley P. |
4 |
Asbestos tile and Mastic |
$0 |
B - Shells/Building Systems |
| 123 |
Murray |
8 |
Replace Water Mains and Fire Hydrants |
$800 |
B - Shells/Building Systems |
| 124 |
Jax |
5 |
Demolish Veterans 4, Veterans OT and Veterans Kitchen Buildings |
$500 |
B - Shells/Building Systems |
| 125 |
ISD |
3 |
Install security system in remaining building on campus |
$980 |
B - Shells/Building Systems |
| 126 |
Howe |
3 |
Replace the 3 asborbersd cooling towers 27,29, and 27. |
$2,000 |
B - Shells/Building Systems |
| 127 |
Elgin |
6 |
Construct maintenance storage building |
$1,700 |
B - Shells/Building Systems |
| 128 |
Elgin |
2 |
Chiller replacement |
$2,750 |
B - Shells/Building Systems |
| 129 |
Chester |
6 |
Re-Insulate The Hydronic Piping System |
$300 |
B - Shells/Building Systems |
| 130 |
ISD |
5 |
Replace windows Unit 2 & 3; Repair cupolas at Unit 1,2 & 3 |
$1,720 |
B - Shells/Building Systems |
| 131 |
Madden |
7 |
Utility Systems Backup |
$1,500 |
C - Roads/Utilities/Site |
| 132 |
Ludeman |
4 |
Water Main and Fire Hydrant Replacement |
$1,500 |
C - Roads/Utilities/Site |
| 133 |
Kiley |
9 |
Auditorium Upgrade |
$250 |
C - Roads/Utilities/Site |
| 134 |
Kiley |
5 |
Bridge Replacement |
$175 |
C - Roads/Utilities/Site |
| 135 |
Alton |
7 |
Sewer System Inflow Remediation |
$273 |
C - Roads/Utilities/Site |
| 136 |
Alton |
4 |
Replace flooring in 2 patient buildings |
$190 |
E - Minor Repair & Remodeling |
| 137 |
Chester |
9 |
Asbestos Abatement |
$2,000 |
B - Shells/Building Systems |
| 138 |
Madden |
1 |
Door/Lock Replacement-Elopement Reduction |
$525 |
B - Shells/Building Systems |
| 29-138 Subtotal |
|
|
|
$125,018.0 |
|
| 1-138 Total |
|
|
|
$224,252 |
|